Booth Construction & Design
- Booth construction drawings for assembly
- Safety and operating manuals
- Duct specification & HVAC consulting for optimal airflow performance
Whether you're building a new extraction lab or upgrading an existing space, Guardian delivers engineered documentation and a clear scope that AHJs, contractors, and operators can trust. C1D1 / C1D2 (sometimes written CID1 / CID2) refers to Class I, Division 1 and Class I, Division 2 hazardous-location classifications. Over 300 extraction safety systems designed since 2017.
GES develops engineered documentation and shop drawings to match the specific configuration of your booth, equipment, and facility layout — supporting permitting, equipment plans, and future inspections, while preventing delays caused by missing or outdated drawings.
A dedicated Project Engineer works directly with your team to design a complete facility safety solution — gas detection, ventilation controls, alarms, fan logic, interlocks, and code-compliant safety documentation — tailored to your process and building layout. We support you through permitting, plan review, installation, inspection, and ongoing technical support so your safety system stays compliant and reliable at every step.
Modifying or Relocating a Booth?
If you modify or relocate an existing booth, updated engineering documentation is often required. Guardian keeps your safety system and drawings aligned with real-world conditions in your lab — so the next inspection doesn't surprise you.
OEM Compatibility
Guardian supports operators running legacy HAL Extraction, ExtractionTek Solutions (ETS), and Precision Extraction booth platforms — and works with custom and non-OEM extraction systems on new builds and retrofits.